How long does it take to build a website?
Published guides put a professionally built website at two to five months, and the development stage alone at four to ten weeks. Building a small site yourself takes about 20 to 40 hours. What sets the timeline, and what slows it down.
Want this done for you? See our website and app development service. Related reading: How much does a small business website cost? · How much does it cost to build an app? · How much does website maintenance cost?
Key takeaways
- Wix says a website built with a professional takes two to five months; Shopify puts the range at one week to five months.
- Shopify puts the development stage alone at four to ten weeks.
- Clutch says most web design projects it reviews last seven months, and app projects about 11 months.
- Content and approvals slow most projects more than the building does.
The short answer
A website built by a professional usually takes two to five months from first call to launch. That is the range in Wix’s guide to website timelines. Shopify’s timeline guide gives a wider span, between one week and five months, and puts the development stage alone at four to ten weeks.
Building it yourself is faster to start but not free: Wix says a small business site built yourself takes roughly 20 to 40 hours, spread over a few weeks. Bigger projects take longer. Clutch says most web design projects reviewed on its site last seven months. With our website development, the timeline is agreed in writing before work starts.

Timelines by type of project
Published figures, read on 23 October 2026. They describe the market, not any one project.
| Project | Published timeline | Source |
|---|---|---|
| A small business site you build yourself | About 20 to 40 hours over a few weeks | Wix |
| A website built with a professional | Two to five months | Wix |
| A website, from planning to launch | One week to five months | Shopify |
| The development stage | Four to ten weeks | Shopify |
| Web design projects reviewed on Clutch | Most last seven months | Clutch |
| A mobile app | About 11 months | Clutch |
Why published timelines differ so much
The ranges above are wide because they measure different things. A builder template with your own words can be live in days. A custom design for a business with several services, a blog and connections to booking or payment tools takes months, and most of that time is spent waiting for decisions, words and photos rather than building.
Clutch’s seven months covers projects big enough to be reviewed on a directory. A small business site with six pages and a clear brief sits at the shorter end. Before you sign, ask for a written plan that names each stage, what you need to supply and by when, and what happens to the date if something arrives late.
The stages, and what slows each one
- Planning. Agreeing the pages, features and who the site is for. Slow when too many people have a say, or when nobody can decide.
- Design. Drawing the pages before anything is built. Slow when feedback comes in late or changes direction after sign-off.
- Content. Writing the words and gathering photos. This is the most common cause of delay, because it is the owner’s job and it competes with running the business.
- Building. Turning the approved design into a working site. Slow when features are added halfway through.
- Testing and launch. Checking the site on real phones and browsers, setting up tracking and pointing the domain. Slow when the domain login has been lost.
How the options compare
| Build it yourself | A freelancer or agency | Blue Leopard Media | |
|---|---|---|---|
| Published timeline | About 20 to 40 hours (Wix) | Two to five months (Wix) | Agreed in writing in your quote |
| Design sign-off | Your own | Varies | Every screen approved before any code |
| Your time needed | All of it | Content and feedback | Content and feedback |
| Tracking at launch | You set it up | Often left out | GA4, Google Ads tag and Meta Pixel set up before launch |
Descriptions of the other routes are general, and yours may differ.
How to get your site live sooner
- Write the words for your main pages before the project starts, even roughly.
- Pick one person to give feedback and sign off the design.
- Find your domain and hosting logins early.
- Launch with the pages you need now and add the rest later.
Where Blue Leopard Media fits
Business websites start at $1,499 for up to six pages, and growth websites at $2,999 for up to twelve pages plus a blog. The pages, features and timeline are agreed in writing before any work starts, and you approve every screen before any code is written. See the prices.
Frequently asked.
How long does it take to build a website?
Wix says a website built with a professional takes two to five months, and Shopify puts the range at one week to five months. A small site you build yourself takes about 20 to 40 hours.
How long does website development take?
Shopify puts the development stage, after planning and design, at four to ten weeks.
What slows a website project down?
Usually the content: writing the words and gathering photos. Late feedback and features added halfway through are the next most common causes.
How long does it take to build an app?
Clutch says mobile app projects usually take about 11 months.
Keep reading.
How much does a small business website cost in 2026?
A small business website costs about $2,000 to $10,000 from a freelancer and $15,000 or more from an agency in 2026. What changes the price, and what it buys.
Read the guide CostsHow much does it cost to build an app in 2026?
Most app projects reviewed on Clutch cost $10,000 to $49,999, and the average is about $90,780. What changes the price, and the fees you pay after launch.
Read the guide CostsHow much does website maintenance cost in 2026?
Website maintenance costs about $39 to $99 a month on a care plan in 2026, plus hosting at $2 to $80 a month. What each part costs and what to check.
Read the guideA website with the timeline agreed in writing.
Business websites from $1,499, designed and built by the team that runs your ads. A written quote with the pages, features and timeline before any work starts.